
| Parameter | Value |
|---|---|
| Orderable part number | CL1108-3-50TR-R |
| Number of phases | 3 |
| Rated inductance per phase | 50 nH ±20% |
| Open circuit inductance (OCL) | 400 nH / 380 nH (per pin pair) |
| DC resistance (DCR) | 0.28 mOhm |
| Rated current per phase | 50 A |
| Peak current per phase | 80 A |
| Magnetizing inductance @ 5 Adc | 300 nH |
| Package | CL1108 footprint (see drawing) |
| Packaging | TR - tape and reel |
| RoHS | Compliant (-R suffix) |
With 3 phases of 50 nH each, the ripple on a given rail is the sum of the individual phase currents. Adding phases does not just divide the current - it also shapes the ripple, which is why the phase count is part of the VRM design rather than a purchasing decision.
DCR 0.28 mOhm is why the 3-phase version exists. Halving the current per phase by doubling the phase count cuts the loss per phase by four, and the total inductor loss with it.
CL1108 是标准型 50 nH 多相功率电感,2 到 5 相可选。
Saturation is a hard limit, not a derating curve. In a multi-phase converter the phases share the load, so a single phase that saturates first takes the whole transient on its own shoulders. 3 phases is the common configuration for a mid-power VRM. The phase count is set by the converter, not by the inductor - what matters here is that this part is the 3-phase variant with the matching pinout and DCR.
How do the phases connect?
The datasheet gives the pin numbering for each phase pair - (3-4)(5-6) and so on - and the layout has to keep each phase current loop tight.
How do the phases connect?
The datasheet gives the pin numbering for each phase pair - (3-4)(5-6) and so on - and the layout has to keep each phase current loop tight.
Is this part RoHS compliant?
Yes - the -R suffix on the part number denotes the RoHS build.
Design note: use the full-load inductance and the hot-case
DCR for the loss budget, and check the layout keeps each phase current loop closed.

Dimensional drawing and recommended PCB pad layout from the Eaton data sheet. Tolerances and pad dimensions are as printed on the drawing; check the outline against your layout before release.
Shenzhen Gaorunxin Technology Co., Ltd
Shenzhen Gaorunxin Technology Co., Ltd