
| Parameter | Rating |
|---|---|
| Parameter | Value |
| Manufacturer / Series | Littelfuse / TR5® 374 |
| Part number | 37412000000 |
| Fuse characteristic | Slo-Blo® / Time-Lag (T) |
| Rated current | 2 A |
| Rated voltage | 250 VAC |
| Interrupting capability | 50 A @ 250 VAC |
| Package | TR5® radial lead fuse; Long leads; Tape & Ammopack |
| Mounting method | Through Hole, Radial |
| Dimensions | Ø8.5 mm × 8.0 mm max; lead Ø0.6 mm |
| Lead pitch | 5.08 mm |
| Operating temperature | -40°C to +85°C |
| Approvals | cULus E67006; CSA 51378 |
| Standards / compliance | Designed to UL 248-14; cULus E67006; CSA 51378 up to 6.3A |
| Environmental | RoHS; lead-free; halogen-free |
| Packaging / order code | 0000: Tape & Ammopack, 1,000 pcs; Long leads; lead length 18.8 mm |
| Product status | Verify current orderability with Littelfuse / authorized distribution |
Typical places this fuse turns up:
Order code 37412000000 from Littelfuse, supplied in TR5® radial lead fuse; Long leads; Tape & Ammopack. Confirm the exact suffix before release.
What are the ratings of the 37412000000?
2 A continuous at 250 VAC, interrupting rating 50 A @ 250 VAC.
Can the 37412000000 be used on a higher fault-current circuit?
No — its interrupting rating is 50 A @ 250 VAC. Choose a part whose breaking capacity exceeds the prospective fault current.
Shenzhen Gaorunxin Technology Co., Ltd
Shenzhen Gaorunxin Technology Co., Ltd