Littelfuse 37418000000 8 A TR5® 374 Fuse, 250 VAC, Long leads, 0000
Littelfuse 37418000000 8 A TR5® 374 Fuse, 250 VAC, Long leads, 0000

Littelfuse 37418000000 8 A TR5® 374 Fuse, 250 VAC, Long leads, 0000

Share
pLittelfuse 37418000000 — 8 A, 250 V, fuse, 50 A @ 250 VAC interrupting./p
    • Product Details
    • Download

    Littelfuse 37418000000 8 A TR5® 374 Fuse, 250 VAC, Long leads, 0000

    The 37418000000 from Littelfuse carries 8 A, rated 250 VAC.

    Technical Data

    ParameterRating
    ParameterValue
    Manufacturer / SeriesLittelfuse / TR5® 374
    Part number37418000000
    Fuse characteristicSlo-Blo® / Time-Lag (T)
    Rated current8 A
    Rated voltage250 VAC
    Interrupting capability50 A @ 250 VAC
    PackageTR5® radial lead fuse; Long leads; Tape & Ammopack
    Mounting methodThrough Hole, Radial
    DimensionsØ8.5 mm × 8.0 mm max; lead Ø0.6 mm
    Lead pitch5.08 mm
    Operating temperature-40°C to +85°C
    ApprovalscULus E67006
    Standards / complianceDesigned to UL 248-14; cULus E67006; CSA 51378 up to 6.3A
    EnvironmentalRoHS; lead-free; halogen-free
    Packaging / order code0000: Tape & Ammopack, 1,000 pcs; Long leads; lead length 18.8 mm
    Product statusVerify current orderability with Littelfuse / authorized distribution

    Practical Notes

    • Interrupting capability is 50 A @ 250 VAC — confirm the circuit's prospective fault current stays below this.
    • Working voltage must stay at or below 250 VAC; a lower-rated part is not a safe substitute.
    • Do not upsize beyond 8 A to stop nuisance trips — fix the cause instead.

    Application Scenarios

    Common installation contexts include:

    • battery
    • EV
    • industrial control
    • charger

    Buying Notes

    Order code 37418000000 from Littelfuse, supplied in TR5® radial lead fuse; Long leads; Tape & Ammopack. Confirm the exact suffix before release.

    Questions and Answers

    What are the ratings of the 37418000000?

    8 A continuous at 250 VAC, interrupting rating 50 A @ 250 VAC.

    Can the 37418000000 be used on a higher fault-current circuit?

    No — its interrupting rating is 50 A @ 250 VAC. Choose a part whose breaking capacity exceeds the prospective fault current.

    Shenzhen Gaorunxin Technology Co., Ltd

    Online message

    Shenzhen Gaorunxin Technology Co., Ltd

    Related Products