Littelfuse 80412000000 2 A TE UMF 804 Fuse, 250 VAC, Long leads, 0000
Littelfuse 80412000000 2 A TE UMF 804 Fuse, 250 VAC, Long leads, 0000

Littelfuse 80412000000 2 A TE UMF 804 Fuse, 250 VAC, Long leads, 0000

Share
pLittelfuse 80412000000 — 2 A, 250 V, fuse, 150 A @ 250 VAC interrupting./p
    • Product Details
    • Download

    Littelfuse 80412000000 2 A TE UMF 804 Fuse, 250 VAC, Long leads, 0000

    Built by Littelfuse, the 80412000000 carries 2 A, rated 250 VAC.

    Technical Data

    ParameterRating
    ParameterValue
    Manufacturer / SeriesLittelfuse / TE UMF 804
    Part number80412000000
    Fuse characteristicTT Time-Lag
    Rated current2 A
    Rated voltage250 VAC
    Interrupting capability150 A @ 250 VAC
    PackageTE Universal Modular Fuse (UMF), radial; Long leads; Tape & Ammopack
    Mounting methodThrough Hole, Radial
    DimensionsTE5-class subminiature radial body; lead Ø0.6 mm
    Lead pitch5.08 mm
    Operating temperature-40°C to +125°C
    ApprovalsUL E242325; VDE 40029388; CQC; KC; CE/UKCA; PSE
    Standards / complianceIEC 60127-1 & 60127-4; EN 60127-1 & 60127-7; GB 9364.1/.4; J/K 60127; UL E242325; VDE; CQC; PSE/KC
    EnvironmentalRoHS; lead-free; halogen-free
    Nominal cold resistance0.0458 Ω
    Nominal melting I²t88 A²s
    Packaging / order code0000: Tape & Ammopack, 1,000 pcs; Long leads; lead length 18.8 mm
    Product statusVerify current orderability with Littelfuse / authorized distribution

    Selection Notes

    • Interrupting capability is 150 A @ 250 VAC — confirm the circuit's prospective fault current stays below this.
    • Working voltage must stay at or below 250 VAC; a lower-rated part is not a safe substitute.
    • Do not upsize beyond 2 A to stop nuisance trips — fix the cause instead.

    Typical Applications

    Engineers usually specify it for these duties:

    • battery
    • EV
    • industrial control
    • charger

    Part Number and Packing

    Order code 80412000000 from Littelfuse, supplied in TE Universal Modular Fuse (UMF), radial; Long leads; Tape & Ammopack. Confirm the exact suffix before release.

    Q&A

    What are the ratings of the 80412000000?

    2 A continuous at 250 VAC, interrupting rating 150 A @ 250 VAC.

    Can the 80412000000 be used on a higher fault-current circuit?

    No — its interrupting rating is 150 A @ 250 VAC. Choose a part whose breaking capacity exceeds the prospective fault current.

    Shenzhen Gaorunxin Technology Co., Ltd

    Online message