Littelfuse TR5® 372 37200400001 | 40 mA 250 VAC Fuse | Long leads | 1,000 pcs
Littelfuse TR5® 372 37200400001 | 40 mA 250 VAC Fuse | Long leads | 1,000 pcs

Littelfuse TR5® 372 37200400001 | 40 mA 250 VAC Fuse | Long leads | 1,000 pcs

Share
pLittelfuse 37200400001 — 40 mA, 250 V, fuse, 35–63 A @ 250 VAC (rating-dependent); 50 A @ 125 VDC interrupting./p
    • Product Details
    • Download

    Littelfuse TR5® 372 37200400001 | 40 mA 250 VAC Fuse | Long leads | 1,000 pcs

    Built by Littelfuse, the 37200400001 carries 40 mA, rated 250 VAC.

    Technical Data

    ParameterRating
    ParameterValue
    Manufacturer / SeriesLittelfuse / TR5® 372
    Part number37200400001
    Fuse characteristicSlo-Blo® / Time-Lag (T)
    Rated current40 mA
    Rated voltage250 VAC
    Interrupting capability35–63 A @ 250 VAC (rating-dependent); 50 A @ 125 VDC
    PackageTR5® radial lead fuse; Long leads; Tape & Ammopack
    Mounting methodThrough Hole, Radial
    DimensionsØ8.5 mm × 8.0 mm max; lead Ø0.6 mm
    Lead pitch5.08 mm
    Operating temperature-40°C to +85°C
    ApprovalscRUus E67006; CE; UKCA; CCC
    Standards / complianceUL/CSA/NMX 248-1 & 248-14; EN/J/K 60127-1 & 60127-3; GB/T 9364.1 & 9364.3; CE/UKCA
    EnvironmentalRoHS; lead-free; halogen-free
    Packaging / order code0001: Tape & Ammopack, 1,000 pcs; Long leads; lead length 18.8 mm
    Product statusVerify current orderability with Littelfuse / authorized distribution

    Selection Notes

    • Interrupting capability is 35–63 A @ 250 VAC (rating-dependent); 50 A @ 125 VDC — confirm the circuit's prospective fault current stays below this.
    • Working voltage must stay at or below 250 VAC; a lower-rated part is not a safe substitute.
    • Do not upsize beyond 40 mA to stop nuisance trips — fix the cause instead.

    Typical Applications

    Engineers usually specify it for these duties:

    • battery
    • EV
    • charger

    Part Number and Packing

    Order code 37200400001 from Littelfuse, supplied in TR5® radial lead fuse; Long leads; Tape & Ammopack. Confirm the exact suffix before release.

    Q&A

    What are the ratings of the 37200400001?

    40 mA continuous at 250 VAC, interrupting rating 35–63 A @ 250 VAC (rating-dependent); 50 A @ 125 VDC.

    Can the 37200400001 be used on a higher fault-current circuit?

    No — its interrupting rating is 35–63 A @ 250 VAC (rating-dependent); 50 A @ 125 VDC. Choose a part whose breaking capacity exceeds the prospective fault current.

    Shenzhen Gaorunxin Technology Co., Ltd

    Online message