Littelfuse TR5® 374 37401600000 | 160 mA 250 VAC Fuse | Long leads | 1,000 pcs
Littelfuse TR5® 374 37401600000 | 160 mA 250 VAC Fuse | Long leads | 1,000 pcs

Littelfuse TR5® 374 37401600000 | 160 mA 250 VAC Fuse | Long leads | 1,000 pcs

Share
pLittelfuse 37401600000 — 160 mA, 250 V, fuse, 50 A @ 250 VAC interrupting./p
    • Product Details
    • Download

    Littelfuse TR5® 374 37401600000 | 160 mA 250 VAC Fuse | Long leads | 1,000 pcs

    The 37401600000 from Littelfuse carries 160 mA, rated 250 VAC.

    Technical Data

    ParameterRating
    ParameterValue
    Manufacturer / SeriesLittelfuse / TR5® 374
    Part number37401600000
    Fuse characteristicSlo-Blo® / Time-Lag (T)
    Rated current160 mA
    Rated voltage250 VAC
    Interrupting capability50 A @ 250 VAC
    PackageTR5® radial lead fuse; Long leads; Tape & Ammopack
    Mounting methodThrough Hole, Radial
    DimensionsØ8.5 mm × 8.0 mm max; lead Ø0.6 mm
    Lead pitch5.08 mm
    Operating temperature-40°C to +85°C
    ApprovalscULus E67006; CSA 51378
    Standards / complianceDesigned to UL 248-14; cULus E67006; CSA 51378 up to 6.3A
    EnvironmentalRoHS; lead-free; halogen-free
    Packaging / order code0000: Tape & Ammopack, 1,000 pcs; Long leads; lead length 18.8 mm
    Product statusVerify current orderability with Littelfuse / authorized distribution

    Practical Notes

    • Interrupting capability is 50 A @ 250 VAC — confirm the circuit's prospective fault current stays below this.
    • Working voltage must stay at or below 250 VAC; a lower-rated part is not a safe substitute.
    • Do not upsize beyond 160 mA to stop nuisance trips — fix the cause instead.

    Application Scenarios

    Common installation contexts include:

    • battery
    • EV
    • industrial control
    • charger

    Buying Notes

    Order code 37401600000 from Littelfuse, supplied in TR5® radial lead fuse; Long leads; Tape & Ammopack. Confirm the exact suffix before release.

    Questions and Answers

    What are the ratings of the 37401600000?

    160 mA continuous at 250 VAC, interrupting rating 50 A @ 250 VAC.

    Can the 37401600000 be used on a higher fault-current circuit?

    No — its interrupting rating is 50 A @ 250 VAC. Choose a part whose breaking capacity exceeds the prospective fault current.

    Shenzhen Gaorunxin Technology Co., Ltd

    Online message