Littelfuse TR5® 374 37415000000 | 5 A 250 VAC Fuse | Long leads | 1,000 pcs
Littelfuse TR5® 374 37415000000 | 5 A 250 VAC Fuse | Long leads | 1,000 pcs

Littelfuse TR5® 374 37415000000 | 5 A 250 VAC Fuse | Long leads | 1,000 pcs

Share
pLittelfuse 37415000000 — 5 A, 250 V, fuse, 50 A @ 250 VAC interrupting./p
    • Product Details
    • Download

    Littelfuse TR5® 374 37415000000 | 5 A 250 VAC Fuse | Long leads | 1,000 pcs

    Littelfuse TR5® 374 37415000000 | 5 A 250 VAC Fuse | Long leads | 1,000 pcs belongs to the Littelfuse range. It carries 5 A, rated 250 VAC.

    Technical Data

    ParameterRating
    ParameterValue
    Manufacturer / SeriesLittelfuse / TR5® 374
    Part number37415000000
    Fuse characteristicSlo-Blo® / Time-Lag (T)
    Rated current5 A
    Rated voltage250 VAC
    Interrupting capability50 A @ 250 VAC
    PackageTR5® radial lead fuse; Long leads; Tape & Ammopack
    Mounting methodThrough Hole, Radial
    DimensionsØ8.5 mm × 8.0 mm max; lead Ø0.6 mm
    Lead pitch5.08 mm
    Operating temperature-40°C to +85°C
    ApprovalscULus E67006; CSA 51378
    Standards / complianceDesigned to UL 248-14; cULus E67006; CSA 51378 up to 6.3A
    EnvironmentalRoHS; lead-free; halogen-free
    Packaging / order code0000: Tape & Ammopack, 1,000 pcs; Long leads; lead length 18.8 mm
    Product statusVerify current orderability with Littelfuse / authorized distribution

    Design Notes

    • Interrupting capability is 50 A @ 250 VAC — confirm the circuit's prospective fault current stays below this.
    • Working voltage must stay at or below 250 VAC; a lower-rated part is not a safe substitute.
    • Do not upsize beyond 5 A to stop nuisance trips — fix the cause instead.

    Where It Is Used

    Typical places this fuse turns up:

    • battery
    • industrial control
    • charger

    Ordering Details

    Order code 37415000000 from Littelfuse, supplied in TR5® radial lead fuse; Long leads; Tape & Ammopack. Confirm the exact suffix before release.

    Common Questions

    What are the ratings of the 37415000000?

    5 A continuous at 250 VAC, interrupting rating 50 A @ 250 VAC.

    Can the 37415000000 be used on a higher fault-current circuit?

    No — its interrupting rating is 50 A @ 250 VAC. Choose a part whose breaking capacity exceeds the prospective fault current.

    Shenzhen Gaorunxin Technology Co., Ltd

    Online message

    Shenzhen Gaorunxin Technology Co., Ltd

    Related Products