Littelfuse TR5® 383 38312500000 | 2.5 A 300 VAC Fuse | Long leads | 1,000 pcs
Littelfuse TR5® 383 38312500000 | 2.5 A 300 VAC Fuse | Long leads | 1,000 pcs

Littelfuse TR5® 383 38312500000 | 2.5 A 300 VAC Fuse | Long leads | 1,000 pcs

Share
pLittelfuse 38312500000 — 2.5 A, 300 V, fuse, Rating-dependent; up to 100 A (300/320/250 VAC per datasheet) interrupting./p
    • Product Details
    • Download

    Littelfuse TR5® 383 38312500000 | 2.5 A 300 VAC Fuse | Long leads | 1,000 pcs

    Littelfuse TR5® 383 38312500000 | 2.5 A 300 VAC Fuse | Long leads | 1,000 pcs belongs to the Littelfuse range. It carries 2.5 A, rated 300 VAC.

    Technical Data

    ParameterRating
    ParameterValue
    Manufacturer / SeriesLittelfuse / TR5® 383
    Part number38312500000
    Fuse characteristicSlo-Blo® / Time-Lag (T)
    Rated current2.5 A
    Rated voltage300 VAC
    Interrupting capabilityRating-dependent; up to 100 A (300/320/250 VAC per datasheet)
    PackageTR5® radial lead fuse; Long leads; Tape & Ammopack
    Mounting methodThrough Hole, Radial
    DimensionsØ8.5 mm × 8.0 mm max; lead Ø0.6 mm
    Lead pitch5.08 mm
    Operating temperature-40°C to +85°C
    ApprovalscRUus E67006; PSE; CE
    Standards / complianceIEC 60127-3; UL/CSA/NMX 248-1 & 248-14; cRUus E67006; PSE; CE; VDE 4–5A
    EnvironmentalRoHS; lead-free; halogen-free
    Nominal cold resistance0.0215 Ω
    Nominal melting I²t29.69 A²s
    Packaging / order code0000: Tape & Ammopack, 1,000 pcs; Long leads; lead length 18.8 mm
    Product statusVerify current orderability with Littelfuse / authorized distribution

    Design Notes

    • Interrupting capability is Rating-dependent; up to 100 A (300/320/250 VAC per datasheet) — confirm the circuit's prospective fault current stays below this.
    • Working voltage must stay at or below 300 VAC; a lower-rated part is not a safe substitute.
    • Do not upsize beyond 2.5 A to stop nuisance trips — fix the cause instead.

    Where It Is Used

    Typical places this fuse turns up:

    • EV

    Ordering Details

    Order code 38312500000 from Littelfuse, supplied in TR5® radial lead fuse; Long leads; Tape & Ammopack. Confirm the exact suffix before release.

    Common Questions

    What are the ratings of the 38312500000?

    2.5 A continuous at 300 VAC, interrupting rating Rating-dependent; up to 100 A (300/320/250 VAC per datasheet).

    Can the 38312500000 be used on a higher fault-current circuit?

    No — its interrupting rating is Rating-dependent; up to 100 A (300/320/250 VAC per datasheet). Choose a part whose breaking capacity exceeds the prospective fault current.

    Shenzhen Gaorunxin Technology Co., Ltd

    Online message